Project was to construct an unmanned aerial vehicle hanger for the Gray Eagle Company at Fort Riley, Kansas.
Mechanical equipment included (1) 8,000 CFM VAV air handler as well as (2) single zone AHU’s, (2) heat recovery units, (1) 40 ton chiller, (2) 200 MBH high efficiency condensing boilers, (5) inline exhaust fans, (2) Unit heaters, (15) VAV terminal units, (6) DX computer room split systems, (3) Cabinet unit heaters, (8) Hydronic pumps, (2) Rotary screw air compressors, (1) Refrigerated air dryer, (1) 1000 MBH Infra-red heater system, as well as other mechanical equipment. Plumbing equipment included (2) solar collectors, (1) 150 MBH High efficiency gas fired water heater, as well as low flow plumbing fixtures.