Fort Riley - Child Development Center

 

 

 

 

 

 

Project Description/Scope:

The re-structuring of the military has resulted in more children living on military bases across the country. This created a need for added child development related facilities throughout the nation. AMC was selected to develop a program that would quickly respond to this immediate need. AMC gathered a team of established professionals to work with the Department of Defense and provide them with a solution.

Mid-American Water & Plumbing’s role: Provide and install a complete HVAC system which included a 4 Pipe Dual Temperature Hydronic system. Installation of (5) Air Handling Units, in association with an exterior Hot Water Boiler & Pump package and remote York Chiller, (14) Fan Coil Units, ventilation fans, unit heaters, and control systems. In addition, MAWP installed a Kitchen Make-Up Air unit and exhaust system. Mid-American was instrumental in design revisions of a design build nature working closely with the DOR and AMC. All piping, ductwork, insulation, Test and Balance and control wiring and startup were provided by Mid-American Water & Plumbing.


Location Fort Riley, KS
Client U.S. Army Corps of Engineers
Project Size 15,150 SqFt
MAWP Role Mechanical and Plumbing Design Builder
Date Project Began September 2009
Actual Finish Date June 2010